Marking out the site
The string lines go up and the first ground is broken.
The ponds are taking shape on the ground at EcoFarm Uganda, and with every step, we’re building more than just ponds—we’re nurturing hope, creating opportunities, and laying the foundation for a stronger, more sustainable community. See how far we have moved since the site was marked out on 30 August, and what is still needed to finish: perimeter fencing and a solar power system for the pump and supporting equipment.
Work on the ponds is currently underway. These are the remaining items needed to complete it, priced from local supplier quotations.
The site is marked out, the pond is dug and shaped, and shelters are going up beside it. Fencing and solar power are what remain.
See the Progress ↓220 concrete poles, 25 rolls of 6 ft chain-link mesh and straining wire to fence the project site.
Support This Project →Runs the pump and supporting equipment. Option A is a smaller starter system to upgrade later; Option B is a permanent system that needs no upgrade.
Support This Project →Photos from the site between 30 August and 1 October 2026, stage by stage.
Tap any photo to view it full size.
The string lines go up and the first ground is broken.
Banks are raised by hand and the pond starts to fill.
Soil is heaped and levelled, and stumps and debris are cleared away.
Walls and roofing go onto the shelter while the neighbouring ground is tilled.
The pond banks are being compacted to strengthen and secure them, preparing the slopes for grass planting around the ponds.
Work carries on, with a new pole frame going up and soil still being moved.
| Category | UGX | £ equivalent | Status |
|---|---|---|---|
| Perimeter Fencing | 9,774,980 (approx.) | £2,000.61 | Required |
| Solar System, Option A (upgrade later) | 4,555,000 | £932.26 | Choose A or B |
| Solar System, Option B (permanent) | 24,668,000 | £5,048.71 | Choose A or B |
| Fencing + Option A | 14,329,980 | £2,932.87 | |
| Fencing + Option B | 34,442,980 | £7,049.32 |