Right Now

Fish project: what is left to complete

Work on the ponds is currently underway. These are the remaining items needed to complete it, priced from local supplier quotations.

In progress The fish pond holding water, with a shelter and a second frame behind it

Fish Project: Pond Construction

The site is marked out, the pond is dug and shaped, and shelters are going up beside it. Fencing and solar power are what remain.

Photos from 30 Aug to 14 Oct 2026
See the Progress ↓
Required

Perimeter Fencing

220 concrete poles, 25 rolls of 6 ft chain-link mesh and straining wire to fence the project site.

£2,000.61 · UGX 9,774,980 (approx.)
Support This Project →
Choose A or B

Solar Power System

Runs the pump and supporting equipment. Option A is a smaller starter system to upgrade later; Option B is a permanent system that needs no upgrade.

Option A £932.26 · Option B £5,048.71
Support This Project →
Progress So Far

How far we have moved

Photos from the site between 30 August and 1 October 2026, stage by stage.

Done on site

  • ✓Site marked out with string lines and first ground broken
  • ✓Pond excavated, with banks raised and shaped by hand
  • ✓Pond holding water
  • ✓Site cleared of stumps and debris
  • ✓Shelters framed and walled, with roofing under way
  • ✓Neighbouring ground tilled

Still to fund

  • ○Perimeter fencing: £2,000.61
  • ○Solar power system for the pump and supporting equipment: £932.26 (Option A) or £5,048.71 (Option B)
1
30 Aug 20262 photos

Marking out the site

The string lines go up and the first ground is broken.

2
5 Sep 20264 photos

The ponds taking shape

Banks are raised by hand and the pond starts to fill.

3
8 – 11 Sep 20264 photos

Shaping the banks and clearing the site

Soil is heaped and levelled, and stumps and debris are cleared away.

4
14 – 19 Sep 20265 photos

Shelters rise and the land is prepared

Walls and roofing go onto the shelter while the neighbouring ground is tilled.

5
1 – 14 Oct 20265 photos

Firming the pond banks ahead of grass planting

The pond banks are being compacted to strengthen and secure them, preparing the slopes for grass planting around the ponds.

6
26 Sep – 1 Oct 20262 photos

A second structure and ongoing earthworks

Work carries on, with a new pole frame going up and soil still being moved.

Budget summary

Category UGX £ equivalent Status
Perimeter Fencing 9,774,980 (approx.) £2,000.61 Required
Solar System, Option A (upgrade later) 4,555,000 £932.26 Choose A or B
Solar System, Option B (permanent) 24,668,000 £5,048.71 Choose A or B
Fencing + Option A 14,329,980 £2,932.87
Fencing + Option B 34,442,980 £7,049.32

Help us complete the fish project.

We are raising funds for perimeter fencing (£2,000.61) together with a solar power system. With Option A the total is UGX 14,329,980 (£2,932.87); with Option B it is UGX 34,442,980 (£7,049.32). The solar system is a one-off capital purchase: Option B costs more now but removes the need for any future upgrade as the project grows.

Support EcoFarm Uganda →
Want more detail on the budget, or to discuss how a contribution would be used? Reach out at ecofarmu@gmail.com | Uganda